Powder concentrator

Product fineness : 80 μmR 0~3%

Output : 10-260t/h

Application area : grinding production of building industry

Application equipment : cement vertical mill, slag vertical mill, vertical raw mill and so on.

Powder concentrator is also called separator, which is installed on the upper of the vertical mill and licked with the middle shell. The separator comprises a shell, cage rotor, wind guide blades and gearing. Its inner structure is reasonable, separating efficiency is high and energy-saving effect is obvious.

1 (1).jpg

1 (1).jpgFrom above picture, we know that the working principle has four steps:

1. Through grinding and being dried, the substance with the air go into powder concentrator together through bottom and the wind guide blades making the powder and air together becoming a tangential flow. The rotation direction of trochanteric is same to the whirlpool orientation of wind guide blades.

2. The space between wind guide blades and rotor vane form a centrifugal one which makes the powder and air separate.

3. Large-grained material is cast to external, fell down by gravity, collected and returned to grinding table for re-grinding.

4. Together with the air, the finished material leave the powder concentrator through the outlet conduit

1. Advanced classification principle, increasing the diversity.

Using O-SEPA classification principles (that is whirlpool grading area formed by wind guide blades and cage rotors) design the grading area, add dispersal and pre-grading areas making the dispersal and powder selecting zones separated effectively, which extremely increased the material diversity, decreased the load of main grading area and relieved the interference effect between large and fine granules.

2. Simply adjusting fineness.

The fineness of finished material is decided by the rotor speed. Increasing the rotor speed, the material fineness is finer; on the contrary, the material granule will be coarse.

3. Obvious energy-saving effect

The equipment system adopts geometric design which reduced the systemic resistance evidently and powder selecting is internal recycling. The fines collecting uses high-efficient and low-resistant cyclone instead of large-scale gas tank pulse dust collectors, which not only reduce the system electric consumption, but also lower investment cost and maintenance charge, energy-saving and cost-reducing effects are deeply obvious.

4. Improving end product quality, avoiding over grinding

Because the equipped powder concentrator is high-efficient and high-precision, the over grinding phenomenon is reduced. The size distribution of end product particle is narrow and the grading composition is reasonable.

1 (1).jpg

1 (1).jpg

Model Product fineness Blast capacity Rotate speed Motor powder Maxium throughput Output
R0.08(%) (m³/h) (rpm) (KW) (t/h) (t/h)
S-250 0~3 15000 250~500 11 50 10~18
S-350 0~3 21000 220~450 18.5 90 15~28
S-500 0~3 30000 180~400 22 120 20~40
S-750 0~3 45000 160~340 30 150 30~50
S-1000 0~3 60000 130~300 37 210 40~70
S-1250 0~3 75000 130~280 37 250 50~85
S-1500 0~3 90000 130~260 45 300 75~100
S-1750 0~3 105000 120~250 55 360 85~120
S-2000 0~3 120000 120~240 55 420 110~140
S-2500 0~3 150000 110~200 75~90 520 130~170
S-3000 0~3 180000 110~180 90~110 600 150~200
S-3500 0~3 210000 110~180 110~132 690 180~230
S-4000 0~3 240000 110~180 132~160 780 200~260

CHAENG insists on taking “satisfaction of customers is our eternal pursuit" as service tenet, promoting "Three heart Service" concept, providing customers with one-stop integrated service solution during pre-sale, in-sale and after-sale process.

1. Pre-sale

After knowing customers' specific requirements, within 48 hours giving quotation and completing designing the flow chart of product program. If in need, welcome you to visit our factory and we will offer the whole journey reception services to you. Visiting Line: 400-108-6668

2. In-sale

After sign a contract and receive the down money, we promise the delivery of main engine production line is 4-6 months, processes supervising and examining goods and offer packaging and transportation plan within 7 days before shipment; other services will obey the contract.

3. After-sale

CHAENG will arrange engineer to train and guide local employees, making customers start production easily.

Typical case

The powder concentrator installation effect drawing of Shanghai Baosteel slag vertical mill:

1 (1).jpg

Up to August of 2015, the 1,500,000 T/A slag composite powder production line of Shanghai Baosteel has finished construction and is about to put into working.