CHAENG 600,000 t/a Slag Powder Production line

In 2009, we invested CNY 50 million to build the GGBFS plant demonstration and training base with capacity 600,000 t/a, the main equipment of which used the biggest self-made GRMS 46.41 vertical mill. The purpose of this plant is to let customer have a direct knowledge on GGBFS process and technology. After running 3 years, the project has recovered total cost of investment.

Project Party A: Great Wall Slag Powder Co., Ltd.

Project Area: Huixian City, Henan Province, China

Core Equipment: GRMS46.41 Slag Vertical Roller Mill

Annual Output: 600,000 tons GGBFS
 

Project overview:

Project name: CHAENG slag powder demonstration and training base with annual production of 600,000t

Project address: Great Wall Road, Mengzhuang Town, Huixian City, Henan Province

Contracting mode: General contracting---turnkey project

Host configuration: GRMS 46.41 slag vertical roller mill

Production capacity: Annual production of 600,000t slag powder

矿渣1_副本.jpg

As a new type of high performance concrete admixture, ground granulated blast furnace slag (GGBFS) has all kinds of performance advantages about improving concrete compressive resistance, tensile resistance, sheared resistance and bended resistance. chaeng is a professional supplier of GGBS production line, provide "turnkey" service.