CHAENG:1000tpd cement plant project case Introduction in Central Asia

 

1000tpd cement plant project case Introduction

Process type  New Dry cement Process line
Capacity 1000 TPD
Main equipment  GRMR22.31 (vertical raw mill) & GRMC16.21 (vertical coal mill)  ,φ3.2x50m rotary kiln,Rotary dryer
Feature

Energy Saving, Environmental Protection

Project site Uzbekistan

1000tpd cement plant project case Introduction

This cooperation only lasted for less than 10 days from investigation to sign the contract. It’s the technical strength and good reputation in the industry of Great Wall to let customer to make a firm choice. It marks that CHAENG achieves new breakthrough on exploiting central Asia market again.

1000tpd cement plant project case Introduction

Project Advantages

For the new type cement production line, Chaeng adopts the advanced energy saving technology in the crushing and calcining process, the waste hot air generated from the rotary kiln can be recycled for raw material drying and pre-heat pyrolysing to achieve the energy saving, environmental friendly purpose.

 

 

 

 

Powerful crushing,scientific stockpiling

New vertical mill grinding process, Low energy consumption in grinding

preheating before calcination, High efficiency and energy saving

Low Investment ,Environment Friendly

The limestone crushing

use single-section hammer

crusher that feeding size is 800mm,

 

production capacity is 180 t/h,

and grinding by advanced

vertical raw mill- GRMR22.31.

Scientific material piling and

taking technology, to

achieve the initial

raw material homogenization.

 

The energy consumption

in cement grinding process

accounts for more than

60% of the whole

production line, therefore,

it has great significance

in ensuring product quality

and reducing energy consumption

by using high efficiency

and energy saving GRM series

vertical roller mill to deal

with raw material, coal, clinker.

Raw materials are sent

into φ3.2x50m rotary kiln

to be calcined after

preheating and precalcining

in the cyclone preheater.

That is conducive to

improve the production

efficiency of kiln system,

shorten rotary kiln length,

and reduce the heat

consumption of clinker

calcining.

Vertical mill grinding

system operate in negative

pressure, low dust pollution;

System equipment layout is

compact, low area

occupying,

low investment in civil

construction; Environmental

protection in recycling kiln

exhaust gas.

 

1000tpd cement plant project case Introduction

 

About Us

Xinxiang Great Wall Machinery Corporation, located at National Sustainable Development Experiment Area, Xinxiang City, Henan Province, China, was initially built in 1958 and restructured into limited liability Company from township collective enterprise in 2002.

Covering an area of 330,000 m² and having more than 1,100 employees, the company has a total asset of CNY 500 million and has passed ISO9001:2008 quality management system authentication and is a main specialized supplier for manufacturing large scale kiln mill. Possessing the experience of equipment manufacturing for more than half a century, the Company has formed the perfect operation and management system in design and development, product manufacturing, market promotion, equipment installation and after sales service.

Since the first ball mill produced in 1968, the company has produced more than 2600 sets of mills and rotary kilns in various specifications, and the products are sold to each provinces of China, and exported to America, Russia, Japan, Brazil, India, South Korea, Vietnam, Kenya, Iran and others, enjoys high market reputation.