In 2019, a customer from Central America signed a general contracting project with Xinxiang Great Wall Machinery (CHAENG) for a cement grinding plant with an output of 50 tons per hour. The project is currently under construction and is expected to be completed and put into operation in January 2023.
Close to the bank of the Yangtze River, Shagang Group, a large-scale private iron and steel enterprise in China with an annual output of over 40 million tons of steel, finally decided to use the CHAENG steel slag vertical mill to turn steel slag into treasure, and the construction was contracted by CHAENG.
In order to produce high-quality steel slag micropowder, a company in Sichuan decided to cooperate with CHAENG to build a general contracting project for a steel slag micropowder production line with an annual output of 450,000 tons.
300,000t/y GGBS Plant project in Indonesian built by CHAENG cooperating with POSCO is under construction and expected to be put into production in July.
This project was launched by PT.Indoferro for disposing the nickel slag produced in steel smelting process,is the first nickel slag powder production line in Indonesia.
It is a two-purpose Production Line with two parts. One is a 300,000t/a steel slag production line, and the other is a 1.2 million t/a GGBFS production line.
The project is the key project of the Great Wall company under “One Belt One Road”. The owner is a well-known enterprise in Uzbekistan. Main Equipment: GRMR26.21 raw material vertical mill 3.2x50m cement rotary kiln GRMK33.31 cement vertical mill GRMC16.21 coal vertical mill
Henan Meng Electric Group is one of the top 30 clinker production enterprises and one of the key cement production enterprises in Henan province.