Tianshan Cement is one of the twelve large cement enterprise groups,ordered 4.8x72m rotary kilns and 16 sets of 4.2x13m ball mills from CHAENG.
In order to expand the industrial chain, this customer cooperated with CHAENG again to build 2x200,000t/y active calcium carbonate production lines.
This production line runs stably with low energy consumption, high output, and small dust emission.
The project runs stably with the output of 65-75t/h, system power consumption of 38 KWh/t and fineness of 430~450㎡/kg, which reached designed output and standard.
The owner of this project built this line according to the local conditions and makes full use of the rich slag resources and convenient transportation in Tangshan.
Aosen Steel cooperates with Xinxiang Great Wall twice and signed two 600000t/a slag powder production line EPC contract.
Shanghai Baosteel wanted to make a national demonstrative project, after a lot of research it chose Xinxiang Great Wall Machinery as the EPC construction unit.
This 4500 t/d dry cement clinker production line is the largest project invested by Tailong Corporation.