10 Apr,2018 UTC+8 Views:
As a professional slag powder comprehensive service provider in China, chaeng has its own slag powder research center. After continuous efforts and innovation, the developed GRMS slag vertical mill combines a wealth of manufacturing experience and draws on the German Loesche vertical mill technology and autonomy. The R&D energy-saving and environmental-friendly grinding equipment is widely used in the grinding of slag, steel slag, nickel slag and other industrial wastes, and is widely used in major production lines.
Since the first slag grinding plant was put into operation in 2007,chaeng has been continuously innovating and upgrading. At present, GRMS slag vertical mill has won the recognition of many steel enterprises and commercial enterprises with reliable quality, and is exported to foreign countries. Recently, Great Wall Machinery has independently introduced new technologies such as GRMS19, GRMS23, GRMS60, GRMS65, GRMS70 and other models of GRMS series slag vertical mills to meet the demand for a single-line annual output of 15-1.5 million tons of slag powder production lines.
Model
|
Grinding Table Diameter (mm)
|
Motor (kW)
|
Output (t/h)
|
GRMS19
|
1900
|
560
|
15
|
GRMS23
|
2300
|
710
|
20
|
GRMS26
|
2600
|
1000
|
28
|
GRMS30
|
3000
|
1400
|
40
|
GRMS33
|
3300
|
1600
|
45
|
GRMS36
|
3600
|
2000
|
60
|
GRMS38
|
3800
|
2240
|
65
|
GRMS40
|
4000
|
2500
|
75
|
GRMS43
|
4300
|
3000
|
90
|
GRMS46
|
4600
|
3150
|
95
|
GRMS50
|
5000
|
4000
|
125
|
GRMS53
|
5300
|
4500
|
145
|
GRMS56
|
5600
|
5000
|
155
|
GRMS60
|
6000
|
6300
|
180
|
GRMS65
|
6500
|
7300
|
220
|
GRMS70
|
7000
|
8500
|
260
|
chaeng invested 50 million yuan in 2010 and used the self-made GRMS46.41 slag vertical mill as the main engine. It successfully built and put into production a demonstration production line with an annual output of 600,000 tons of slag powder. The demonstration production line was completely completed by chaeng from design to infrastructure to installation and commissioning. Today, the slag production line runs well and the grinding efficiency is extremely high.
The main design parameters of GRMS46.41 slag vertical mill are: the production capacity reaches 90~110 t/h, the finished product fineness is 420~450m2/Kg, the output water is less than or equal to 1%, and the main motor power is 3150 KW. The vertical mill allows up to 15% of milled water, which is beneficial to the large-scale production of ore fines. Good operation, normal indicators, played a good demonstration effect
Chaeng not only can provide stand-alone equipment selection scheme, but also can provide the project general contracting service for the design, manufacture, installation, commissioning and production of slag, steel slag and other industrial waste slag grinding production lines, enabling customers to worry, effort, Efficiently put in the production of ore meal.
Pre: Another energy-saving and environmental protection slag grinding line was constructed by chaeng
Next: The 19th China International Cement Industry Exhibition