HOME PRODUCTS TURNKEY SOLUTIONS CASE News Gallery Special coverage PDF download Video About CHAENG Chairman's Oration CHAENG Capacity CHAENG Service CONTACT US
Chaeng home > News

Chaeng undertakes the project of 300,000 tons of slag powder production line in Xinjiang

11 Sep,2018 UTC+8 Views:


● Material: slag

● Capacity: 300,000 tons per year

● Host : GRMS33.31 slag vertical mill

The slag is the industrial waste discharged from the blast furnace iron production process. After grinding, the slag powder of certain fineness can be blended into cement or concrete according to a certain proportion, resulting in good economic and environmental benefits. With the continuous increase of environmental protection efforts, more and more steel production enterprises have increased investment in waste residue treatment, and turned solid wastes that were directly abandoned or simply used in the past into waste, and the slag has been comprehensively utilized.

It is a well known steel production enterprise. On October 24, 2017, which signed a contract with chaeng for the annual production of 300,000 tons of slag powder production line project. The project was officially launched on December 17, 2017 and it successfully put into operation in April 2018.

Operation Situation

slag production line

slag grinding plant

slag grinding mill

The annual output of 300,000 tons of slag powder production line project is operated by load, the output is 45t/h, the specific surface area is ≥400m2/kg, and the output and quality meet the design requirements.

Project display

Chaeng can provide EPC general contracting services for single-line production of 10-1.5 million tons of slag powder production line. Up to now, chaeng has successfully established 110 slag powder production lines at home and abroad. You are welcome to make an appointment at any time!

Request for Quotation