Material distribution on grinding table not optimal
Potential causes:
Feed chute too short
Proposed solutions:
Prolong feed chute
Expected results:
More stable material bed
Less vibrations
Estimated costs:
Minimal
Implementation time: Mid-term
Grinding tools with high wear
Potential causes:
Recommendation of equipment supplier
Proposed solutions:
Investigate alternative (better) grinding tools
Expected results:
Prolonged lifetime of grinding tools
Reduced specific grinding costs
Estimated costs:
Medium
Implementation time: Mid-term
Manual operation
Potential causes:
Original installation not improved
Proposed solutions:
Investigate possible automation
Expected results:
More stable operation
Reduced specific costs of milling
Estimated costs:
High
Implementation time: Long-term
Material falling through nozzle ring
Potential causes:
Original installation not improved
Proposed solutions:
Install external material circulation
Expected results:
Less cleaning necessary
Environmental aspects improved
Estimated costs:
High
Implementation time: Long-term
CHAENG provides customers with a full range of services:
1. Design: Send a professional team to inspect the production line, and determine the appropriate
vertical mill model and specifications;
2. Manufacture: CHAENG has its own large casting base, can ensure the quality of equipment and accessories, such as: vertical mill grinding table, vertical mill grinding roller, rocker arm etc.;
3, Maintenance: CHAENG can provide customers with maintenance service for vertical mill host machine, surfacing repair for grinding roller and grinding table, and parts replacement, etc., online warranty service model is convenient and quick.