18 Oct,2023 UTC+8 Views:
In recent years, with the implementation of the two-carbon policy, efforts to control the total coal consumption has become China's commitment to the world. But for coal-fired power plants, cement plants, steel plants and lime plants that use coal as their main fuel, how to reduce emissions of carbon dioxide, nitrogen oxides, sulfur dioxide and soot? Experts pointed out that in fact, reducing coal consumption is not the ultimate goal, but to improve the clean and efficient use of coal.
Pulverized coal mill is an important equipment for the preparation of pulverized coal, only fine pulverized coal is fully burned in the boiler, in order to improve the utilization rate of pulverized coal and reduce the possibility of environmental pollution, so its grinding efficiency is very important for thermal power plants and cement plants. Therefore, it is crucial to choose a more energy-saving and efficient pulverized coal preparation equipment.
In China, the vertical mill has been widely used in thermal power plants and cement plants because of its small footprint, light structure and low energy consumption. Xinxiang Great Wall coal vertical mill set grinding, grading, conveying, powder selection in one, large output, low energy consumption, in addition, the equipment has more advantages:
CHAENG can provide GRMC pulverized coal vertical mill equipment with an annual output of 8-800,000 tons according to customer needs to meet the heat source needs of different types of pulverized coal.
GRMC coal vertical mill adopts flat cone roller, the mill runs more smoothly, grinding efficiency is higher, the failure rate is low, more safe and reliable, operation and management is convenient, suitable for all kinds of raw coal varieties. At the same time, GRMC coal vertical mill power consumption is only 14~20kWh/t, low energy consumption, more energy saving and environmental protection, greatly reducing production costs.
A cement company in China needs to carry out energy-saving technical reform on the pulverized coal preparation system of the cement clinker production line with a daily output of 4000 tons. It plans to build a new coal vertical grinding system with an hourly capacity of 40 tons, which is contracted by our company. Now the whole project is under installation and construction.