The owner of this project built this line according to the local conditions and makes full use of the rich slag resources and convenient transportation in Tangshan.
Aosen Steel cooperates with Xinxiang Great Wall twice and signed two 600000t/a slag powder production line EPC contract.
Shanghai Baosteel wanted to make a national demonstrative project, after a lot of research it chose Xinxiang Great Wall Machinery as the EPC construction unit.
With scientific production technology and advanced equipment, CHAENG's new dry process cement production line improves the equipment level of this project.
Rotary kiln, as one of the most important equipment in this production line, must has the advantage of energy saving, high efficiency and environmental friendly.
After a multinational investigation contrast, Uzbekistan customer officially signed a cement production line of 1000TPD with CHAENG on March 16, 2016.